KSL Classifieds

I-15 Reconstruction
2100 South- I-15 Interchange

Originally designed with loops connecting westbound 2100 South to westbound SR 201, the basic configuration has been changed.

The current plan eliminates westbound 2100 South loop to westbound SR 201, and replaces it with a new ramp from a signalized intersection at 2100 South/700 West.

This change should add up to a shared savings of $5.6 million, with a total saving to the Department of $2.8 million.

This is just one of many modifications in design for the ongoing project.

| KSL-TV Home Page | Main News Page |